Zhang Lu.
WEEKLY · 2026-W44 ·

Another Quiet Week for the Public Site: Keep Local Preparation Within the Public Boundary

Git history and committed development logs show no new verifiable public delivery this week; this report records a stable site without presenting uncommitted local changes, drafts, or plans as released work.

The through-line: no new release, and no local preparation entered into the public record

For 26 October–1 November, the zhanglu.net Git history and committed docs/dev-log entries were checked. This complete ISO week contains no new commits and no new development record that can serve as evidence for a public release.

So this report does not list uncommitted workspace content, work-in-progress drafts, or future plans. It records one verifiable fact only: by the end of the week, repository history contains no new public-site delivery.

A public timeline does not need manufactured momentum

Weekly reports are available through both pages and JSON endpoints, and readers should be able to trace their claims through Git commits and development records. Presenting uncommitted or unverified local changes as live would erase the boundary that makes this public timeline reliable.

There are no new projects, essays, or features to list as public results for this week. The existing site continues to be provided through previously committed bilingual content, the Astro build, and the deployment pipeline. Once a delivery has been committed and verified, a later report can archive it accurately.

This week in one line: a public record can leave space; keeping preparation from being called a release makes every later update more trustworthy.